Organic Waste Gas Incineration System
Introduction of the product:
Organic waste gas is produced in various industries such as petroleum, chemical, printing, and pharmaceutical. Traditional purification methods often lead to incomplete purification and secondary pollution. Our exhaust gas direct combustion furnace incineration system ensures thorough combustion and decomposition of organic matter in the exhaust gas.
Processing objects:
Petroleum, chemical industry, industrial waste gas, coating waste gas, toxic gas, and more.
Processing Capacity:
30-30000 Nm³/h
Technical advantages:
- The combustion system is designed based on the 3T principle, achieving a destruction and removal rate of organic matter exceeding 99.99%.
- Three-stage waste heat utilization for low heat value waste gas treatment.
- Vortex exhaust gas nozzle for effective turbulence.
- High combustion speed and efficiency with over 99.99% organic waste gas decomposition rate.
- PLC automatic control for easy operation.
- High thermal energy recovery efficiency for steam, hot water, and hot air recycling.
- Safety features for explosion limit considerations.
Flow chart:
Introducing our innovative Compact Direct Flame Disposal Unit for efficient, eco-friendly waste management. This portable incinerator offers safe and low-cost disposal solutions.
Our certification:
Production process:
FAQ:
Jiangsu Wanxin Environmental Technology Co., Ltd.
Welcome to Jiangsu Wanxin Environmental Technology Co., Ltd., a leading manufacturer specializing in the research, development, sales, manufacturing, installation, and service of incinerators.
Product Description:
- Product: Incinerators
- Features:
- Customized solutions based on waste composition and processing volume
- Professional design team for tailored solutions
- Acceptable payment methods: TT and L/C
- Delivery time: 3 to 5 weeks depending on order quantities and specifications
- Standard packaging with the option for special requirements
- Installation support with detailed illustrations and technician assistance
- How to Purchase: Contact us with waste composition and processing volume details for a suitable solution and pricing.
- Payment: TT and L/C accepted, with TT preferred.
- Delivery Time: Typically within 3 to 5 weeks based on order specifications.
- Packaging: Standard packaging provided, with customization available upon request.
- Installation: Detailed illustrations and technician support offered for installation.