Pyrolysis Furnace Product Description
Pyrolysis Furnace
Introduction:
The Pyrolysis Furnace offered by Jiangsu Wanxin Environmental Technology Co., Ltd. is a cutting-edge solution for the centralized disposal of medical waste, household waste, and a small amount of industrial waste. It comes in fixed and continuous types, with continuous furnaces featuring grate rotation and double rotation of grate and furnace body structures.
Features:
- Vertical cylinder design with drying, pyrolysis, burnout, and burning sections
- Corrosion-resistant, high temperature-resistant, and high-strength refractory materials
- Water jacket construction for efficient cooling and smooth operation transition
- Waste inlet at the top, burners on both sides, and supply outlet at the bottom
- Oxygen control method for complete gas combustion and minimal solid particle emissions
- Sealed incineration system with automatic combustion support device
- 99.99% removal rate of organic matter and ultra-low emissions of CO and VOCs
Technical Specifications:
- Processing Capacity: 2-80T/D
- Temperature: Adjustable up to 1100ºC
Benefits:
- Efficient utilization of waste heat energy
- Clean, aesthetic, and pollution-free operation
- Complete combustion process with 100% efficiency
Flow Chart:
[Insert Flow Chart Image Here]
Medical Hazardous Waste Removal Incineration System
An environmentally friendly solution for medical waste disposal, our advanced incineration system ensures safe and efficient removal of hazardous materials.
Production process:
FAQ:
Jiangsu Wanxin Environmental Technology Co., Ltd.
Manufacturer with extensive sales experience specializing in the research, development, sales, manufacturing, installation, and service of incinerators.
FAQs:
Q: Are you a factory or trade company?
A: We are a manufacturer with years of sales experience dedicated to incinerators.
Q: How to buy your product?
A: Provide waste composition and daily processing volume for a tailored solution and pricing.
Q: How to pay?
A: TT and L/C accepted, TT preferred.
Q: What is the delivery time?
A: 3 to 5 weeks based on order quantities and specifications.
Q: How to pack the products?
A: Standard packaging used; special requirements accommodated.
Q: How to install after delivery?
A: Detailed illustrations provided; technicians available if needed.