Customization: | Available |
---|---|
After-sales Service: | One Year |
Warranty: | One Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Rotary incineration kiln, offered by Jiangsu Wanxin Environmental Technology Co., Ltd., is a leading solution in waste treatment with an 85% market share. It efficiently handles solid, liquid, and gaseous wastes through two types of equipment: down-flow and counter-flow.
Perfect for low moisture, high volatile materials, the down-flow operation mode simplifies waste incineration systems with lower temperatures, convenient operation, and effective control against melting slag from high calorific value waste.
Ideal for waste materials with higher moisture content and low flammability, this type is designed for sludge drying, ensuring efficient drying and release of volatile water.
Chemical waste residue, sludge, electronic products, household waste, medical waste, lithium electronics industry waste, as well as waste liquid and exhaust gas.
3-400T/D.
Efficiently handles waste treatment processes with high efficiency and compliance with environmental standards.
Item | unit | Index |
Rotary kiln temperature | ºC | 850~1100 |
Rotary kiln (secondary combustion chamber) temperature | ºC | 1100~1200 |
Incineration efficiency | % | 99.9 |
Incineration removal rate | % | 99.99 |
Thermal reduction rate of incineration residue | % | 2 |
Daily capacity | t | 5~100 |
Annual running time | h | ≥7200 |
Explore our cutting-edge Industrial Waste Incineration Technology for efficient, reliable, and environmentally friendly waste management.
Welcome to Jiangsu Wanxin Environmental Technology Co., Ltd., a leading manufacturer specializing in the research, development, sales, manufacturing, installation, and service of incinerators.
Our professional design team is dedicated to providing tailored solutions based on your waste composition and daily processing volume. We ensure the best price for your ideal product.
We accept payment via TT and L/C, with TT being preferred. Delivery time typically ranges from 3 to 5 weeks, depending on order quantities and specifications.
Our products are carefully packed in standard packaging, with the option for special packaging upon request.
Upon arrival at your destination, detailed installation instructions will be provided, and our technicians can assist if needed.