Customization: | Available |
---|---|
After-sales Service: | Provide Warranty |
Warranty: | One Year Warranty |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The Liquid Waste Furnace is designed with a vertical or horizontal structure, featuring a refractory pouring system. Key components include a waste liquid storage tank, filter, pressure transmitters, waste liquid pump, automatic regulating valve, flow meter, atomizer, compressed air, and pressure transmitters. The waste liquid spray gun atomizes the waste liquid efficiently into the furnace.
The waste liquid pipeline is made of corrosion-resistant materials with a dual filter system to prevent blockages. Special design is required for incinerating waste liquid with salt to ensure complete combustion of organic matter while preventing salt melting. Precise temperature control is crucial to maintain furnace temperature stability.
High COD wastewater, high concentration waste liquid, organic waste solvent, and salty waste liquid.
20-3000kg/h.
Company: Jiangsu Wanxin Environmental Technology Co., Ltd.
Jiangsu Wanxin Environmental Technology Co., Ltd. presents the Innovative Environmental Waste Liquid Incinerator for efficient liquid waste disposal. This advanced incinerator offers environmentally friendly solutions for industrial liquid waste management.
1. Q: Are you a factory or trade company?
A: We are a manufacturer with many years of sales experience, committed to the research and development, sales, manufacturing, installation, and service of incinerators.
2. Q: How to buy your ideal product?
A: You can tell us the composition of the waste and the daily processing volume (connect us for more details). We have a professional design team that will provide a suitable solution according to your requirements and offer the best price.
3. Q: How to pay?
A: TT and L/C are acceptable, with TT being more appreciated.
4. Q: What is the delivery time?
A: It depends on order quantities and specifications of incinerators. Generally speaking, the delivery time will be within 3 to 5 weeks.
5. Q: How to pack the products?
A: We use standard packaging. If you have special packaging requirements, we will pack as required.
6. Q: How to install after the equipment arrives at the destination?
A: We will provide detailed illustrations to you. If necessary, we will send technicians to help you.