Organic Waste Gas Incineration System
Introduction of the product:
Organic waste gas is produced in various industries such as petroleum, chemical, printing, and pharmaceutical. Traditional purification methods often lead to incomplete purification and secondary pollution. Our exhaust gas direct combustion furnace incineration system ensures thorough combustion and decomposition of organic waste gases, meeting environmental emission standards.
Processing objects:
Petroleum, chemical industry, industrial waste gas, coating waste gas, toxic gas, chemical odor waste gas, and more.
Processing Capacity:
30-30000 Nm³/h.
Technical advantages:
- The combustion system is designed based on the 3T principle, achieving a destruction and removal rate of organic matter exceeding 99.99%.
- Three-stage waste heat utilization for low heat value waste gas treatment.
- Vortex exhaust gas nozzle for effective turbulence.
- High combustion speed and efficiency with over 99.99% organic waste gas decomposition rate.
- PLC automatic control for easy operation.
- High thermal energy recovery efficiency for steam, hot water, and hot air recycling.
- Safety features for explosion limit, high concentration, etc.
Flow chart:
Introducing our Compact Direct Burn Disposal Device by Jiangsu Wanxin Environmental Technology Co., Ltd. An eco-friendly, portable, and efficient trash burning unit for versatile waste disposal.
Our certification:
Production process:
FAQ:
Welcome to Jiangsu Wanxin Environmental Technology Co., Ltd.
As a leading manufacturer with extensive sales experience, we specialize in the research, development, sales, manufacturing, installation, and service of high-quality incinerators.
Product Information:
- Product Name: Incinerators
- Features: Efficient waste disposal, professional design team, customizable solutions
- Benefits: Environmentally friendly, cost-effective, reliable performance
- Order Process: Provide waste composition and processing volume for a tailored solution
- Payment Options: Acceptable payment methods include TT and L/C
- Delivery Time: Typically within 3 to 5 weeks based on order quantities and specifications
- Packaging: Standard packaging provided; custom packaging available upon request
- Installation: Detailed illustrations and optional technician assistance for seamless setup
For more details on our incinerators and services, please contact us today.